Fig. 9From: An assessment of the interoperability of PPP-AR network productsTransformed FCB, IRC (GRG) and IRC (lower) to relative wide lane clock correction on DOY 28 of 2015 for PRN 10 (relative to PRN 27). DC (middle) was included for comparison. All units are in nanosecondsBack to article page